DIB cybersecurity readiness · November 2026
The C3PAO deadline moved. Your SPRS score did not.
CMMC Phase 1 self-assessments, DFARS 252.204-7012 and annual SPRS affirmations stayed in force after the July 13, 2026 Phase 2 pause. Intrepid Defense helps Tier 2–4 subcontractors score the 110 requirements honestly, shrink the CUI boundary, and price the enclave before a prime, a DCMA assessor or a whistleblower does it for them.
- Conditional statusNot eligible
- Blocking controls3.5.3 · 3.10.4 · 3.12.4
- Assessment gateSSP missing
- Recommended pathCUI enclave
The November 2026 enforcement reality
Four numbers every DIB supplier should know cold
Each figure ties to a statute, a methodology, or a public DOJ resolution. Sources are listed on our methodology page.
Assessed through 320 objectives in NIST SP 800-171A. Score range runs from 110 down to −203.
32 CFR Part 170 requires 80% of the maximum score, with only eligible controls left open, closed within 180 days.
Report to DC3 via the DCISE Incident Collection Format with an ECA Medium Assurance certificate; preserve images 90 days.
Including ILC Dover’s $13.0M (Nov 2026) and LOGZONE, which reported 110 while DCMA scored −170.
Diagnostic launchpad
Two tools built on the actual DoD math
No sign-up wall. Both tools run in your browser, produce a printable brief, and hand their results to a scoping review if you want a second set of eyes.
SPRS Score & POA&M Eligibility Calculator
All 110 requirements across 14 families with DoD Assessment Methodology v1.2.1 weights: 42 five-point, 2 variable 5/3-point, 14 three-point, 51 one-point, and the SSP gatekeeper.
- Live SPRS score from −203 to 110
- 32 CFR 170 conditional-status verdict with the exact blocking controls
- FCA exposure flags, shareable link and printable worksheet
CMMC Level 2 & CUI Enclave Budget Estimator
Prices Microsoft 365 GCC High, PreVeil and Cuick Trac side by side from your headcount, CUI user count, maturity and advisory model, with an optional C3PAO reserve.
- Year 1, Years 2–3 and 3-year totals per architecture
- Months to SPRS readiness for each path
- Scope-reduction recommendation from your CUI user ratio
CUI enclave architecture paths
Three ways the DIB actually isolates CUI
The right answer depends on how many people truly touch CUI. In most Tier 3–4 shops it is a handful of engineers, not the whole company.
Microsoft 365 GCC High
Full sovereign tenant or a dedicated enclave tenant. U.S.-person support, ITAR data residency, and DFARS 7012 contractual commitments. Highest migration effort.
$36 – $95 / user / mo + $25k–$90k setup
PreVeil Encrypted Overlay
End-to-end encrypted email and file sharing layered over your existing Microsoft 365 or Google tenant. Small CUI groups keep their tools; no tenant rip-and-replace.
~$450 / mo starter, scales per seat
Cuick Trac Managed VDI
Turnkey managed virtual desktop enclave that inherits a large share of the 320 assessment objectives. CUI never lands on local endpoints.
~$5,000 setup + $1,050+ / mo
After July 13, 2026
What paused, and what is still binding today
The Phase 2 suspension stopped mandatory third-party certification timelines. It did not touch the contract clauses already in your POs.
Paused Under Memo 26-P-1023
- Phase 2 Mandatory C3PAO Level 2 certification, originally from Nov 10, 2026
- Phase 3 DIBCAC Level 3 assessments, originally Nov 2027
- Phase 4 Full CMMC implementation in all applicable contracts, originally Nov 2028
Active Enforced today
- Phase 1 CMMC Level 1 and Level 2 self-assessments as a condition of award
- DFARS 7012 Adequate security, 72-hour reporting, 90-day preservation
- DFARS 7019/7020 Accurate SPRS score and government assessment access
- 32 CFR 170 Annual senior-official affirmation of continuing compliance
- Flow-down Prime contractor requirements passed to every tier

Built for Tier 2–4 subcontractors
Precision shops, aerospace suppliers and engineering houses
Most of the DIB is a 15-to-150-person company whose CUI is a stack of technical drawings, STEP files and a DD Form 254. You do not need an enterprise program. You need a defensible boundary, an honest score, and an SSP your team can actually maintain.
- Separate CAD/CAM workstations from shop-floor CNC controllers (Specialized Assets)
- Handle prime DFARS 7012 flow-downs without migrating the whole company
- Avoid the Swiss Automation pattern: unprotected drawings, $421,234 settlement
- Pick an RPO or C3PAO without conflict-of-interest surprises
Scoping review
Get a scoping review framed around your role and your contracts.
Owners, compliance managers, IT directors and FSOs get the same thing: where CUI lives today, what your SPRS score really is, and which enclave path costs the least to defend.
- 01Boundary and asset inventory against 32 CFR § 170.19
- 02SPRS score check and POA&M eligibility
- 03Enclave fit: GCC High, PreVeil or Cuick Trac
- 04Introductions to vetted RPOs and C3PAOs