Practice · PIEE / SPRS

Filing Your SPRS Score & Annual Executive Affirmation

The fields, the roles and the internal evidence check that turn a self-assessment into a number you can defend.

DFARS 252.204-7019 32 CFR 170.22 PIEE

Before you log in: the evidence review

The number you enter in SPRS is a representation to the federal government. Before entering it, run a short internal verification so the score can survive a DIBCAC Medium or High assessment:

  1. Confirm the System Security Plan (3.12.4) exists, is current, and names the same boundary and version you will report.
  2. For every requirement scored Met, identify the artifact (configuration, screenshot, policy, log) and the person who can demonstrate it.
  3. Re-score using the SPRS calculator and compare it to any previous submission. Explain any change.
  4. Have someone who did not perform the self-assessment review the five-point and prohibited requirements.
  5. Record the target date to reach 110 and make sure the POA&M supports it.
LOGZONE, June 2026 · $507,144

A self-reported 110 against a DCMA-assessed −170. The fastest way into the settlement tracker is a score nobody checked.

Getting PIEE access

  1. Register in the Procurement Integrated Enterprise Environment (PIEE) as a vendor user for your CAGE code.
  2. Request the SPRS Cyber Vendor User role to enter and view assessments. The company’s Contractor Administrator (CAM) for the CAGE code approves the role.
  3. If your company has several CAGE codes, decide whether the assessment covers one or a hierarchy; SPRS lets you associate an assessment with multiple CAGE codes.

Role approval can take days if the CAM is unknown or has left the company. Sort this out well before a proposal deadline.

Required fields for a Basic Assessment

FieldWhat to enter
CAGE code(s)Every CAGE code covered by the assessed system
Assessment dateDate the self-assessment was completed
Assessment score−203 to 110, calculated with DoD Assessment Methodology v1.2.1
Assessment scopeEnterprise, enclave, or specific system; match the SSP
Plan of action completion dateDate you expect to reach 110 (required if score is below 110)
System Security Plan name / version / dateThe SSP that documents this boundary
Included CAGE codes and descriptionsShort description of the covered system

For CMMC self-assessments under 32 CFR Part 170, SPRS also records the CMMC level, the assessment type (self) and, where applicable, the Conditional status and POA&M closeout date.

The annual senior-official affirmation

32 CFR Part 170 requires an Affirming Official, a senior company official responsible for ensuring compliance, to affirm in SPRS: at completion of each assessment, at POA&M closeout, and annually thereafter, that the contractor has implemented and will maintain the required security. A lapse in affirmation lapses the CMMC status.

  • Name the Affirming Official in your SSP and incident response plan.
  • Brief the official on what they are affirming. An affirmation is signed by a person, and FCA liability attaches to the company, sometimes to individuals.
  • Calendar the annual date and tie it to an internal re-score and evidence refresh.
  • Re-affirm promptly after material changes to the system or boundary.

After you submit

  • Download or screenshot the SPRS confirmation for your records
  • Send primes the score, date and scope they ask for, consistent with the entry
  • Track POA&M milestones; close and verify within 180 days if Conditional
  • Re-assess at least every three years (DFARS 7019), sooner after major change

For the rules behind Conditional status, see the POA&M guide.

Scoping review

Get the score reviewed before your Affirming Official signs.

A scoping review maps where CUI actually lives, scores your environment against all 110 requirements, and prices the enclave path that fits your headcount.

  • 01Boundary and asset inventory against 32 CFR § 170.19
  • 02SPRS score check and POA&M eligibility
  • 03Enclave fit: GCC High, PreVeil or Cuick Trac
  • 04Introductions to vetted RPOs and C3PAOs